Projects / Case Studies
-
Stonefield Way - Mechanical, Electrical & Renewables Installations
Location: Ruislip
Contract Value: £650,000
Contract Duration: 4 Months
KBL have recently completed the Design and Installation of the full Mechanical and Electrical installations to 7 Industrial Units to Stonefield Way in Ruislip.
Click Here
Electrical Services - Solar Photovoltaic, Electric Vehicle Charging Points, Full BNO Network Installation, DNO & Landlords GRP Enclosures, LV Distribution, Lighting, Power, Fire Detection, Part L2A Metering, Lightning Protection
Mechanical Services - Domestic Hot & Cold Water Services, Electric Heating, Mechanical Ventilation Heat Reco... -
Direct Line Repair Centre - Electrical Installation
Location: Welwyn Garden City
Contract Value: £143,000
Contract Duration: 3 Months
Electrical Installation - Basebuild to Direct Line Group Repair Centre
Click Here
LV Distribution, External Lighting & Power, Service Yard Lighting, Office Lighting, Power, Disabled Refuge Installation, Mechanical Power, Leak Detection, Petrol Interceptor Alarm, Fire Detection, Workshop Roller Shutter Doors, Exhaust Ventilation Supplies. Testing & Commissioning -
iPort IP2A - Amazon Distribution Centre Feeder Building
Location: Doncaster
Contract Value: £149,000
Contract Duration: 4 Months
Electrical Installation - Basebuild to IP2A Building - Amazon Distribution Centre Feeder Building.
Click Here
LV Distribution, External Lighting & Power, Service Yard Lighting, Office Lighting, Power, Disabled Refuge Installation, Mechanical Power, Leak Detection, Petrol Interceptor Alarm, Fire Detection, Warehouse Roller Shutter Doors and Dock Levellers. Testing & Commissioning -
Alchemie Ltd - New Warehouses and Office Block
Location: Kineton Warwickshire
Contract Value: £200,000
Contract Duration: 6 Months
Full M&E fit out to New Offices and Warehouses
Click Here
Electrical - LV Distribution, Fire Detection, Intruder Alarm, Cat 6 Structured Network, Access Control, Lighting & Power, Electric Heating
Mechanical - Air Source Heat Pumps, Extract Ventilation, Hot & Cold Water Services, Plumbing & Heating -
iPort IP2B - Fellowes Distribution Centre
Location: Doncaster
Contract Value: £132,100
Contract Duration: 4 Months
Electrical Installation - Basebuild to IP2B Building - Fellowes Distribution Centre
Click Here
LV Distribution, External Lighting & Power, Service Yard Lighting, Office Lighting & Power, Disabled Refuge Installation, Mechanical Power, Leak Detection, Petrol Interceptor Alarm, Fire Detection, Warehouse Roller Shutter Doors and Dock Levellers. Testing & Commissioning -
The Nottingham High School - Senior Management Team Offices & Corridor Works
Location: Nottingham
Contract Value: £116,000
Contract Duration: 6 Weeks
KBL were awarded the full Mechanical & Electrical package for the Nottingham High School SMT Offices and Main Entrance Corridor adopting EP Consulting Engineers Design.
Click Here
Electrical - Lighting and Power, Emergency Lighting, Containment, Fire Detection, Intruder Alarm, Cat 5 Structured Network, Induction Hearing Loop System (AFILS), Testing & Commissioning
Mechanical - Hot & Cold Water Services, LPHW, Heating and Ventilation. Testing & commissioning
-
The Holgate Academy - LED Lighting Upgrade
Location: Nottingham
Contract Value: £124,000
Contract Duration: 6 Weeks
LED Lighting Upgrade to the Holgate Academy in Hucknall
Click Here -
The National Church of England Academy - LED Lighting Upgrade
Location: Nottingham
Contract Value: £90,000
Contract Duration: 6 Weeks
LED Lighting Upgrade to the National C of E Academy in Hucknall
Click Here -
Light Hall School - Boiler Replacement Works
Location: Solihull
Contract Value: £198,000
Contract Duration: 6 Weeks
Plant Room Upgrade & Boiler Replacement Works
Click Here
Electrical - Distribution Board Replacement, New Building Management System & associated Electrical works.
Mechanical - Isolation & Strip Out of redundant boilers and associated plant, Hot & Cold Water Services, LPHW Services, Gas Services, Commissioning & Water Treatment.
Asbestos Removal & Firehalt 60/30 Fire Barrier installation works.
-
The Nottingham High School - Gymnasium, Changing Rooms & Biology Lab
Location: Nottingham
Contract Value: £365,000
Contract Duration: 2 Months
KBL were awarded the full Mechanical & Electrical package for the Nottingham High School Gymnasium, Changing Rooms and Biology Lab adopting EP Consulting Engineers Design.
Click Here
Electrical - Lighting and Power, Emergency Lighting, Containment, Fire Detection, Intruder Alarm, Access Control, Music System, Cat 5 Structured Network, Testing & Commissioning
Mechanical - Hot & Cold Water Services, LPHW, Heating and Ventilation. Testing & commissioning -
University of Nottingham - David Ross Sports Village Health Spa
Location: Nottingham
Contract Value: £55,000.00
Contract Duration: 4 Months
Electrical Services Installation to the new David Ross Sports Village Health Spa & Changing Rooms
Click Here
Project consisted of Eaton Dimming Controls and Sylvania luminaires -
Miura - 211 Bedroom Student Accommodation
Location: Nottingham
Contract Value: £400,000
Contract Duration: 9 Months
KBL have recently completed the Electrical Installation to Nottingham's newest 211 Bedroom Student accommodation right in the heart of the City Centre. Working to a tight deadline, KBL completed all works in time for the new Student intake for September 2019
Click Here
Electrical - LV Distribution, First and Second fix, Testing and Commissioning -
I-Worx - Units 1E & 1F
Location: Bedford
Contract Value: £490,000
Contract Duration: 3 Months
KBL have recently completed the Design and Installation of the full Mechanical and Electrical installations to 12 Advanced Technology and Engineering Workshops totalling 16,328 sq.ft on the mixed-use development at Bedford Commercial Park.
Click Here
The single storey semi-detached units were constructed in 2 terraces of 6 units each ranging from 1,1184 sq.ft. to 1,704 sq.ft.
Electrical Services - Solar Photovoltaic, LV Distribution, Lighting, Power, Fire Detection, Electric Heating, Part L2A Metering, L...